Room Assignments - Integrated With ASI

Room Assignments - Integrated With ASI


MOP is fully integrated with ASI Property Management System. Room Assignments for the day are completed in MOP.

Assignment steps are listed below.

Select Add Tasks
The platform will roll to the options of assigning rooms for the day.
Select Add ASI Tasks 
Utilize the drop-down window to select the associate's name and assign rooms.

If the property management system is down, and as long as there is the Internet, MOP keeps working.
Select Enter Tasks Manually Manual Room Assignments (Add Tasks) (Video)
Platform rolls to manual room assignments. 



    • Related Articles

    • Room Assignments - Integrated with SynXis (Video)

      How to Assign Rooms for Synxis Integrated PMS MOP is fully integrated with SynXis. Room assignments for the day are first created in the Snyxis PMS, then are imported into MOP. If the rooms are imported successfully, there will be a pop-up ...
    • Room Assignments - Integrated with OPERA

      MOP is fully integrated with OPERA. The preferred method of assigning rooms is to complete the assignments in OPERA then import them into MOP. Rooms can be assigned directly through MOP as the systems will sync. If the PMS is down, MOP allows for ...
    • Manual Room Assignments (Add Tasks)

      This section is where you can add Manual Room Assignments. Assign Rooms - Employee: Select the Employee you wish to assign the room to - Verified By: Defaults to what is set up in the MOP profile. If needed, you can override this and select the other ...
    • Room Assignments - Integrated with SKYTOUCH/ChoiceADVANTAGE (Videos)

      MOP is fully integrated with SKYTOUCH/ChoiceADVANTAGE. Room assignments for the day are completed in MOP. Upon notification that the integration of the PMS and MOP is complete, there is a one-time-only prerequisite that will need to be ...
    • Room Attendant Functions in Assigned Rooms

      My Tasks After the Room Attendant logs into MOP, they can select My Tasks to show the room assignments for the day. If a room needs to be cleaned as a High Priority, it can be flagged as such and will show up highlighted in Red. Edit Tasks After any ...