One Time Pre-Requisite Before First Room Assignment (SkyTouch/Choice Advantage) 🎥

One Time Pre-Requisite Before First Room Assignment (SkyTouch/Choice Advantage) 🎥

🎥 Watch Video
When the integration between Skytouch/Choice Advantage and MOP is completed, there is a one-time-only prerequisite that needs to be processed to complete the initial sync.
The pre-requisite consist of entering the every rooms that are alredy checked-in the SkyTouch to enable the communication between the 2 applications.
Path: Dashboard > Add Tasks > Room Resv List



1. Click on Room Resv List



Because the 2way has just been enabled, there has not been communication yet between the 2 applications.
2. Click on "Add Rooms"



3. Using the in-house list from the PMS, enter the first room.



4. Click "Add New" to enter the next one.
5. Click Submit when all checked-in rooms have been entered.



6. Now that all checked-in rooms have been entered, the 2way is now activated. You can do a test by doing a check-in on the PMS and refresh the page on MOP. The new check-in will show in the list.



7. You can check this list every morning before assignment, to make sure it matches the in-house list from the PMS.

    • Related Articles

    • Import Rooms Status for Assignment (SkyTouch/Choice Advantage) 🎥

      ? Watch Video Path: Dashboard > Add Tasks 1. Click on "Add SkyTouch Tasks". 2. Select a Room Attendant's name and assign rooms. You can select rooms one by one or use the shift key and arrow down. To assign a sequence of rooms, select the first ...
    • View All PMS Checked-In Rooms (SkyTouch/Choice Advantage)

      Before importing room status and assigning rooms, you can check that the list of in-house rooms between MOP and the PMS do match. Path: Dashboard > Add Tasks > Room Resv List 1. Click on Room Resv List 2. Check that every room in the list is matching ...
    • Update Checkout Time

      If a guest requests a departure time (i.e. late checkout) other than the hotel's standard checkout time loaded in MOP, you can flag that requested time by changing the Checkout Time status. The new time will be reflected on the All Task screen as ...
    • Import Room Assignments (VM PMS)

      When connected with Visual Matrix, the rooms are first assigned to each housekeeper in the PMS and then imported in MOP. Because of the 2way connection between MOP and Visual Matrix, if a room is checked out of the PMS or if a room status changes in ...
    • PMS Room Import Error Message (Integrated)

      In an integrated environment, after the assignments for guest room cleaning has been imported from the hotel's property management system into the MOP, there will be Messages to indicate the status of the process. When the rooms have been assigned ...